7) A and B can do a work in 12 days, B and C can do the same work in 15 days and A and C can complete the work in 20 days. In how many days A, B and C working together can complete the whole work? 8) A can finish the work in 16 days while B can finish the work in 8 days. After A started the work alone, B joined him after 4 days.
Is a twice as efficient as B?
A is twice efficient as B. A and B together do the same work in as much time as C and D can do together. If the ratio of the number of alone working days of C to D is 2:3 and if B worked 16 days more than C then no of days which A worked alone?
How many people can do a piece of work in 24 days?
13) 30 people can do a piece of work in 24 days. Find out the number of days taken by 40 people to complete the same amount of work. 14)24 men can complete a work in 20 days.
How long does it take A and B to complete a job?
2) If A and B work together, they will complete a job in 7.5 days. However, if A works alone and completes half the job and then B takes over and completes the remaining half alone, they will be able to complete the job in 20 days. How long will B alone take to do the job if A is more efficient than B?
How can A and B finish a job in 60 days?
A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in: Ratio of times taken by A and B = 1 : 3. The time difference is (3 – 1) 2 days while B take 3 days and A takes 1 day. If difference of time is 2 days, B takes 3 days. = 90 days.
How many days does it take to complete A and B?
A takes the rest of one day after every 4 days and B takes the rest of one day after every 5 days. If A and B starts working together, then the work will be completed on In 18 days, both take the rest of 3 days each and the work, done is ( 36 − 6 29) ( 36 − 6 29) part of the work.
What is the total work finished in 18 + 10 days?
They do 2 + 3 = 5 units a day working together, thus they would have finished 90 units in 90/5 = 18 days. Hence the total work was finished in 18 + 10 = 28 days. Example 3: A can do a piece of work in 24 days and B in 20 days but with the help of C they finished the work in 8 days.
How much time does it take to finish a piece of work?
Time taken by A to finish a piece of work is twice the time taken B and thrice the time taken by C. If all three of them work together, it takes them 2 days to complete the entire work. How much work was done by B alone?
How many people can finish the same job in 4 days?
22) 4 men and 2 boys can do a job in 6 2/3 days. 3 women and 4 boys can finish the same job in 5 days. Also 2 men and 3 women can finish the same job in 4 days. In how many days can 1 man, 1 woman and 1 boy finish the work at their double efficiency?
What is the relationship between efficiency and time?
Efficiency and Time are inversely proportional to each other X:y is the ratio of the number of men which are required to complete a piece of work, then the ratio of the time taken by them to complete the work will be y:x
How long does it take to do a bit of work?
Q 1 – A can do a bit of work in 8 days, which B alone can do in 10 days in how long . In how long both cooperating can do it? A’s 1 day work= 1/8, B`s 1 day work = 1/10 ∴ (A+B) 1 day work = (1/8+1/10) = 9/40 Both cooperating can complete it in 40/9 days.
How do you calculate work completed by A and B together?
If one person takes x days to complete a job and another takes y days to complete the job, then together they will complete in (x × y)/ (x + y) ∴ Work completed by A and B together is 6 days.
How much time does Bhim take to complete the work alone?
Bhim takes thrice as much time as Carl and Carl takes thrice as much time as Dinesh to complete the same work. If all together they take 3 days to complete the work. Find the time taken by Bhim alone to complete the work alone. A and B can do a piece of work in 20 and 25 days respectively.
How many days can B alone do that work?
A and B can complete a work in 60 days, B and C can complete it in 80 days, C and A can complete the same work in 120 days. In how many days, B alone, can do that work? – Quora A and B can complete a work in 60 days, B and C can complete it in 80 days, C and A can complete the same work in 120 days.
How long does it take to do a certain piece of work?
To do a certain piece of work, B would take three times as long as A and C together and C twice as long as A and B together. The three men working together can complete the work in 10 days. How long would B take by himself to complete the same piece of work? 24 days
How to calculate the number of days required to complete work?
For example, if A can do a work in 10 days and B can do the same work in 12 days, then the work will be completed in how many days. One day’s work = 1/10 + 1/12 = (12 + 10)/120 [Taking LCM of the denominators] Then the number of days required to complete the work is 120/22. Note that this is a reciprocal of the fraction of work done in one day.