Why is Ethiopia building GERD?
The dam is in the Benishangul-Gumuz Region of Ethiopia, about 45 km (28 mi) east of the border with Sudan. The primary purpose of the dam is electricity production to relieve Ethiopia’s acute energy shortage and for electricity export to neighboring countries.
Who built the GERD dam?
The Grand Ethiopian Renaissance Dam (GERD), formerly known as the Millennium Dam, is under construction in the Benishangul-Gumuz region of Ethiopia, on the Blue Nile River, which is located about 40km east of Sudan. The project is owned by Ethiopian Electric Power Corporation (EEPCO).
Is Ethiopia building a dam?
The $4 billion Grand Ethiopian Renaissance Dam (GERD) was announced in early 2011, as Egypt was in political upheaval. Though construction has been hit by delays, Ethiopia began filling the reservoir behind the dam in 2020.
How much power will the GERD produce?
6,000 megawatts
The Grand Ethiopian Renaissance Dam: Power Dynamics in the Nile River Basin. Once completed, the Grand Ethiopian Renaissance Dam (GERD) will be the largest dam in Africa. Located about 20 miles from the Sudan border, GERD is projected to produce 6,000 megawatts of electricity for both domestic use and for exportation.
What concern does Egypt have about the development of the GERD?
A major concern about the construction of GERD is the filling duration of its reservoir which will decrease Egypt’s share from NR water and accordingly affect water security of Egypt.
How will Gerd help Ethiopia?
Mr Basheer thinks it can be traced back to last year’s filling of the dam. The Gerd, in theory, could help regulate the flow of the Blue Nile and make Sudan less prone to floods. But last year, Sudan was taken by surprise when Ethiopia shut three of the four diversion outlets for the water.
Is Ethiopia filling the GERD?
The process of filling the GERD’s reservoir began last year, with Ethiopia announcing in July 2020 it had hit its target of 4.9 billion cubic metres. The reservoir’s capacity is 74 billion. With the second-year target hit, the dam can run the first two of its 13 turbines, Seleshi said Monday on Twitter.
Where is the GERD dam?
Ethiopia
The Grand Ethiopian Renaissance Dam (GERD) is a 6,450 MW hydropower project nearing completion on the Blue Nile in Ethiopia, located about 30 km upstream of the border with Sudan. It will be the largest hydropower project in Africa.
When did the Ethiopian Renaissance dam start?
July 21, 2020
Grand Ethiopian Renaissance Dam/Opened
What is the Grand Ethiopian Renaissance Dam?
Grand Ethiopian Renaissance Dam. The Grand Ethiopian Renaissance Dam ( GERD or Taehige; Amharic: ታላቁ የኢትዮጵያ ሕዳሴ ግድብ Tālāqu ye-Ītyōppyā Hidāsē Gidib ), formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in Ethiopia that has been under construction since 2011.
What are the dams in Ethiopia?
Ethiopia’s Gibe III dam, which opened on December 17, 2016, is a key component of a massive industrial project in the lower Omo Valley that includes a cascade of water-intensive mega dams, and sugar and cotton plantations. The sugar plantations have been under development in the Omo Valley since 2011.
What is Ethiopian dam?
Location of Grand Ethiopian Renaissance Dam in Ethiopia. The Grand Ethiopian Renaissance Dam (GERD or Taehige; Amharic: ታላቁ የኢትዮጵያ ሕዳሴ ግድብ Tālāqu ye-Ītyōppyā Hidāsē Gidib), formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in Ethiopia that has been under construction since 2011.